Aluminium slat fencing looks simple — posts, slats, done. But the difference between a fence that looks factory-made and one that looks homemade comes down to a handful of details: post depths, consistent gaps, and how you handle slopes. This guide walks through the full install the way we'd want our own product put up.
Tools: string line and pegs, post-hole digger or auger, spirit level (1200 mm), tape measure, drill/driver, rubber mallet, quick-set concrete mix, wheelbarrow or mixing tub, angle grinder with aluminium cutting disc (for trimming slats), spacers or packers for gaps.
Materials per run: posts (one per ~2.4 m plus gate posts), slats to suit your height and gap, top/bottom rails or side channels, fixings, post caps. Our fence calculator builds the exact list from your measurements.
Run a string line between your end points at the finished fence height. Mark every post position — standard spacing is 2.4 m centre to centre to match common slat/panel lengths. Check the line is straight and square to boundaries; a fence that's 20 mm out at the start is 100 mm out by the end of a long run.
Call your local "dial before you dig" service (1100 in Australia, 811 in the US) before any hole goes in the ground. Hitting a service line turns a weekend job into a very expensive one.
Fix your side channels or top/bottom rails to the posts, checking level on every one. Channels must be parallel — if the top channel drifts 5 mm over a run, your slat gaps will visibly taper. Pre-drill aluminium before driving screws: it stops the bit wandering and protects the powder-coat from cracking around the hole.
Start from the bottom and work up (or top-down if your system specifies it). Use packers to hold a consistent gap — never eyeball it; the eye picks up 2 mm of variation across a run. Tap slats home with a rubber mallet, never a steel hammer. Fix through the channel into the slat end, not through the slat face — face-fixing leaves visible screw heads and a water entry point on every board.
Two methods, and choosing wrong is the most common DIY failure:
Rule of thumb: if the fall is more than ~100 mm per 2.4 m bay, step it. Trying to rack a steep slope leaves wedge-shaped gaps under the fence that look wrong and let pets through.
Gate posts get heavier footings — 800 mm deep minimum, and consider a larger post section. Hang the gate, check it swings clear and latches without lifting, then fit post caps. Walk the full run sighting along the top: any slat sitting proud gets eased back now, not later.
600 mm minimum for a 1.8 m fence (one-third in the ground), deeper in soft soil, sand or high-wind zones. Gate posts: 800 mm minimum.
2.4 m centre to centre is the standard — it matches common slat lengths so you don't cut every board.
Yes — rack gentle grades, step steeper ones (see Step 5). Either way, keep the bottom of the fence within 100 mm of the ground along the run.
A handy DIYer: roughly a day per 10–12 metres including post curing time. A two-person crew: 20–30 metres a day on flat ground.
Start with the right materials list.
Try the free Fence Calculator — enter your sides, get panels, posts and custom end panels in 60 seconds, then one tap for a factory quote.